December 2016

CARPENTRY & EPOXY WORKS The first thing  we had to do this month  was to take measurements for the interior woodwork. That  included a double V-berth in the forepeak, a starboard berth in the main cabin and a full stern berth, as well as some other small wood lockers and shelves. After looking around in …

November 2016

COVERING THE DECK- REMOVING THE DIESEL TANK - MAST STEP REPAIR- REMOVING WINCHES & HANDRAILS We started building up a structure made of PVC hoses and plastic covers to keep the deck warm and dry during the winter months. This protection proved to be a very clever idea which enabled us to work on deck …